Project Detail
Contract Type
Engineering,
Procurement & Construction
Location
Hamedan, Iran
Executive Status
Final Handover
Physical Progress
100%
Commencement Date
Mar., 12, 2009
Initial Duration
30 months
Brief Description &
Technical Specification
Bolandpayeh service in this project is to design and build a standby buried Mazut tank with the capacity of sixty thousand cubic meters for the emergency situation of the plant. The tank has
a cubic shape which consists of 4 equal parts.The foundation has a squareshape with the side length of 105 meters. The thickness of the foundation beneath the columns is 60 centimeters and in the other area is 40 centimeters. The height of the walls and columns are 7 meters. The thickness of the walls at the base is 60 centimeters and changes to the top of the wall by 40 centimeters.The tank has 224 columns with a diameter of 1 meter. The full operative height of mazut in the tank is 6 meters.
General works’ Quantity
Earth works 300,000 m³
Concreting 22,000 m³
Reinforcement 3,000 tons
Formworking 38,000 m²
The roof was executed using precast members. There are some corbels elements act as upport of the precast members. After execution of the beams in cast, the precast members were installed and the final concrete cover was poured consequently. A group of shear key elements
was considered in the precast members to merge performance of the precast members and the
final concrete cover. The final level of the roof is about one meter higher than