Gotvand Bridge

Client Iran Water and Power Resources Development Company (IWPC)
Location Shooshtar, Iran
Scope Of Work Engineering, Procurement, Construction (EPC)

Project Detail

Contract Type

Engineering,

Procurement & Construction

Location

Gotvand-Shoushtar, Iran

Executive status

Final Handover

Physical Progress

100%

Commencement Date

May., 21, 2005

Initial Duration

24 Months

 

Brief Description &

Technical Specifications

The subject of this contract is engineering, procurement and construction of the downstream bridge of the Gotvand Dam on Karoun River. The length of the bridge is 260 meters and its width is 12 meters. The concrete structure has an exposed face, which is constructed with special formwork system.

 

General Works’ Quantity

Earth works 22,000 m³

Concreting 5,000 m³

Reinforcement 500 tons

Formworking 1,500 m²

Pile works 1,000 m³

Post Tensioned Cable 200 tons